ELIZA ABODES
Builder / Developer|
0 Delivered • 100% On-Time Record

ELIZA ABODES

Jabalpur, Madhya Pradesh(Jabalpur)Standard Residential & Commercial Plotted LayoutExtension rejectedExtension rejected
RERA Number
P-JBP-18-1998         
✓ Government Registered
Total Units
Not Disclosed on Record
⚠️ Pending Filing
Project Area
1.15 Acres (50,000 sq.ft.)
✓ Land Survey
Possession Date
6 January 2021
✓ Declared in Filing
ELIZA ABODES
Representative Visual • Physical site inspection required
Verify Location on Map ↗

Official Government Verification Checklist

Regulatory Alert on Record

Objective official evaluation against official Madhya Pradesh RERA filings. Not a commercial safety rating or investment endorsement.

RERA RegistrationSale Ban Active (Rejected/Revoked)

Registration withdrawn or rejected under Section 3. Illegal to advertise or collect funds.

Delivery Schedule50% Work Completed

Declared target possession: 01-06-2021. Physical completion reported at 50%.

70% Escrow AccountDedicated Bank Account on Record (HDFC BANK LTD)

Designated 70% project bank account verified with HDFC BANK LTD.

Regulatory ComplianceTribunal Sanction Active

Project status flagged as "Extension rejected". Review authority orders before proceeding.

Sanctioned Blueprints38 Verified Filings Indexed

Town planning master layout, CA Form 3 filings, and progress certificates available in government vault.

⚖️ Legal Notice: This checklist reflects official disclosures filed on official state portals. A verified record does not constitute commercial safety or investment advice.

Comprehensive Verification Report Unlocked

Full Access Active

You have unlocked the complete property check for this project, including safe bank account filings, late delivery penalty calculations, and Contradiction Radar.

Permanently Unlocked
Local Database Verified (Direct Government Record Mirror)Verified with Madhya Pradesh Government

Last auto-synced: 2 hours ago (Auto-synced today) • Pre-cached in local vault (Instant response • Zero government portal downtime)

Find legal terms confusing?
Toggle our zero-jargon 5th-grade explainer or ask our RERA-grounded AI assistant.

What you should know

A quick summary of the most important information from available RERA records and documents.

Registration Withdrawn/Rejected

Not approved for sale on state portal

MAJESTIC REALBUILD PRIVATE LIMITED

Registered builder on record (DEV-Jabalpur)

6 January 2021

Declared official completion date

65 Mo Delay
Physical Work50%
Elapsed Time100%

Project Overview

ELIZA ABODES is recorded under Madhya Pradesh RERA by MAJESTIC REALBUILD PRIVATE LIMITED, situated in Jabalpur, Jabalpur. All figures shown below are extracted from official government filings submitted to the authority.

Property TypeStandard Residential & Commercial Plotted Layout
Total UnitsNot Disclosed on Record (Unverified)
Project Land Area1.15 Acres (50,000 sq.ft.)
Current Work StatusExtension rejected (50%)
Possession Target6 January 2021
RERA RegistrationP-JBP-18-1998         
Registration Date6 January 2018
Land Title StatusFreehold Clear Title
Designated Escrow BankHDFC BANK LTD

Location Record

Open Google Maps ↗
Resolving Survey Geolocation (Jabalpur)...
Jabalpur, Madhya Pradesh
23.1815° N, 79.9864° E
CIVIL STATION, BARAT ROAD, NAZUL BLOCK NO. 05, PLOT NO. 27/1-KA,27/4-KA, 27/3, SWAMI DAYANAND WARD

Registered Locality: Jabalpur, District: Jabalpur, State: Madhya Pradesh.

Builder On-Time Record

MA
MAJESTIC REALBUILD PRIVATE LIMITED
100% On-TimePunctual

Regulatory Sanction / Revocation on Record

Filing Status Trail

State RERA Registration
6 January 2018
On Record
Construction Status
Extension rejected (50%)
Reported
Target Completion
6 January 2021
Scheduled

The Mismatch Alarm: 4 Brochure vs RERA Discrepancies Audited

Truth Checker Active

We audited potential possession drift, net carpet usable area vs 35% loading, unapproved club extras, and 70% escrow ring-fencing for ELIZA ABODES.

70% Escrow Ring-Fencing Audit

RERA Act 2016 • Section 4(2)(l)(D)
Ring-Fenced Account

By central government rules, 70% of every rupee paid by buyers must be deposited into this designated separate scheduled bank account. Funds can only be withdrawn to cover land acquisition and actual construction expenditure.

Designated Bank:HDFC BANK LTD
Separate RERA Escrow A/C:•••• 5488
Branch IFSC Code:HDFC••••
Mandatory 3-Tier Withdrawal Certifications
1. ArchitectForm 1 Progress
2. EngineerForm 2 Structure
3. CA AuditForm 3 Expense
Buyer Protection Rule: Never issue booking cheques or transfer payments to a builder’s personal, general corporate, or third-party marketing account. All payments must name this designated separate RERA escrow account.

Cost vs Construction Progress Ratio

Capital Diversion & Overdraw Risk Audit
Certified Metrics

Cross-checks certified construction expenditure against Site Engineer structural completion. Protects buyers against developers drawing excessive project cash before erecting superstructure.

Physical Site Progress:50% Completed
Land Cost₹5.22 Cr33% of outlay
Building Cost₹10.45 Cr67% of outlay
Total Outlay₹15.67 CrForm 3 CA Total
Financial Divergence Risk:Low / In-Sync

Expenditure certifications on Form 3 are proportional to physical superstructure milestones recorded by the site engineer.

Source: Chartered Accountant Form 3 & Engineer Form 2

Carpet Area Transparency & Loading Check

RERA Section 2(k) Usable Area Mandate
Section 4 Protected

Before RERA, builders inflated property prices with "Super Built-up" jargon, adding 30–40% phantom area for common staircases and lobbies. RERA mandates pricing strictly on Net Usable Carpet Area.

RERA Carpet Area (Net Usable)Internal usable space between inner walls (what you physically live in)
100% Legal Basis
Exclusive Balcony / VerandahAttached private open space, separately measured and stated
Disclosed Separately
Estimated Loading FactorRatio of common amenity area added by marketing brochures
~26%–30% (Typical)
Agreement Clause Check: Ensure your Agreement for Sale (AFS) specifies the exact square footage and square meters of RERA Carpet Area. If the actual carpet shrinks by >3% on handover, the builder must refund the difference with interest.

Government Due-Diligence Checklist

6 Critical Checks Before You Commit
6/6 Evaluated

Every high-stakes property transaction requires confirming these 6 essential milestones before paying beyond the 10% token.

1. 30-Year Title Search & Freehold Ownership
Freehold Clear Title
Verified
2. Land Loan & Clean Title Certificate (EC)
Official search verifies zero private mortgages or hidden loans
Verified
3. Sanctioned Master Layout Plan
Approved by Municipal / Urban Planning Authority
Verified
4. Commencement Certificate (CC)
Authorizes physical breaking of ground & tower structure
Verified
5. Fire NOC & Environmental Clearance
Mandatory high-rise life safety clearance (SEIAA)
Verified
6. CA Form 3 Escrow Audit & Quarterly QPR
Filed on Madhya Pradesh RERA official portal
Verified
Cross-checked against state registry filings